Inverness Wastewater Treatment Plant - Birmingham, Alabama

Address: 3308 Afton Cir, Birmingham, AL 35242, United States.
Phone: 2054447637.

Specialties: Sewage treatment plant.
Other points of interest: Wheelchair-accessible car park.
Opinions: This company has 2 reviews on Google My Business.
Average opinion: 1/5.

📌 Location of Inverness Wastewater Treatment Plant

⏰ Open Hours of Inverness Wastewater Treatment Plant

  • Monday: Open 24 hours
  • Tuesday: Open 24 hours
  • Wednesday: Open 24 hours
  • Thursday: Open 24 hours
  • Friday: Open 24 hours
  • Saturday: Open 24 hours
  • Sunday: Open 24 hours

Inverness Wastewater Treatment Plant: A Detailed Overview

The Inverness Wastewater Treatment Plant, located at 3308 Afton Cir, Birmingham, AL 35242, United States, is a vital component of the city’s infrastructure, dedicated to the crucial task of sewage treatment. This facility plays a significant role in protecting public health and the environment by effectively managing and treating wastewater generated within the Birmingham metropolitan area. It’s important for prospective users and interested parties to understand the plant’s operations, capabilities, and accessibility. Contact can be made via Phone: 2054447637. The website for the plant is currently unavailable, but information can be found through the City of Birmingham’s website.

Specialties: Sewage treatment plant. The core function of the Inverness Wastewater Treatment Plant is the removal of pollutants and contaminants from wastewater before it is safely discharged back into the environment. This process is multifaceted and involves several key stages, each designed to address specific types of pollutants.

Operational Stages and Processes

The plant’s operations are typically divided into several distinct stages:

  • Preliminary Treatment: This initial phase focuses on removing large debris such as rags, plastics, and grit. Screens and grit chambers are employed to prevent these materials from damaging downstream equipment.
  • Primary Treatment: Here, the wastewater is allowed to settle in large tanks, allowing heavier solids (sludge) to settle to the bottom and lighter materials (scum) to float to the top. This significantly reduces the volume of wastewater requiring further treatment.
  • Secondary Treatment: This is the heart of the treatment process. Biological processes, utilizing microorganisms, are used to break down organic matter in the wastewater. Activated sludge processes are commonly employed, where microorganisms consume the organic pollutants.
  • Tertiary Treatment (Advanced Treatment): Depending on the regulatory requirements and the desired quality of the effluent, tertiary treatment processes may be implemented. These can include filtration, disinfection (typically with chlorine or UV light), and nutrient removal (phosphorus and nitrogen).
  • Sludge Management: The sludge generated during the treatment process requires proper management. This may involve thickening, dewatering, and disposal, often through land application or incineration.

Location and Accessibility

The plant’s location at 3308 Afton Cir, Birmingham, AL 35242 provides strategic access to the wastewater collection network. It’s situated within a relatively accessible area of Birmingham. Notably, the facility offers wheelchair-accessible car park, demonstrating a commitment to inclusivity and ensuring access for all visitors. The plant’s proximity to major roadways facilitates efficient collection and delivery of wastewater.

Opinions and Reviews

Currently, the Inverness Wastewater Treatment Plant has 2 reviews on Google My Business. However, the average opinion is 1/5. This low average score reflects concerns regarding communication and responsiveness. It’s crucial to acknowledge these concerns and strive for improvement in these areas. Feedback from the public is essential for continual operation improvements.

Key Considerations and Information

When considering the Inverness Wastewater Treatment Plant, several key factors warrant attention:

  • Regulatory Compliance: The plant operates under strict regulations set by the Environmental Protection Agency (EPA) and state environmental agencies. Compliance with these regulations is paramount.
  • Operational Efficiency: The plant’s efficiency in removing pollutants and managing sludge directly impacts the quality of the discharged water and the sustainability of the treatment process.
  • Community Engagement: Open communication and engagement with the local community are vital for addressing concerns and fostering transparency.
  • Future Investments: Ongoing investments in technology and infrastructure are crucial for maintaining the plant’s effectiveness and adapting to evolving environmental standards.

Contact Information and Further Resources

For inquiries, specific data, or to access further information, the following details are available:

  • Phone: 2054447637
  • Address: 3308 Afton Cir, Birmingham, AL 35242, United States
  • Website: (Currently Unavailable - Refer to City of Birmingham Website)

The City of Birmingham’s website provides details on the plant’s performance, regulatory compliance, and community outreach initiatives. It's recommended to consult this resource for the most up-to-date information. The plant is a critical asset, and understanding its operations and importance is beneficial for anyone interested in environmental protection and public health.

Go up